[1]
Parra, C., Baldi, C., Cuadra, C., Araya, J. , Nuñez, J., Ulloa, C. e González-Prida, V. 2024. Implementation of an asset management plan according to ISO 55001 at the Colmito Power Generation Plant. RAE — Revista de Ativos de Engenharia. 2, 2 (Set. 2024), 041–052. DOI:https://doi.org/10.29073/rae.v2i2.913.