OPTIMISATION OF INVESTMENTS IN ASSET MANAGEMENT OF WATER SUPPLY SYSTEMS USING THE INFRASTRUCTURE VALUE INDEX
Main Article Content
Abstract
The field of asset management provides a coordinated effort to extract value from physical assets, incorporating an integrated approach to deal with risks, costs and performance. This paper proposes an oriented approach to selecting infrastructure investment projects in an asset management framework. The standard metric used for project selection with multiple assets is the Infrastructure Value Index (IVI), which has been used to characterize water sector assets in several countries. Two mixed-integer linear programming models are developed in this paper. The first optimization model deals with a capital budget allocation problem that intends to select investment projects that maximize assets’ condition. The second optimization model deals with a budget planning problem aiming at minimizing the capital required to maintain the assets in the desired condition. The application of the models is illustrated by a case study of a company operating in the water sector in Portugal, namely in a pumping station from a water supply system. The results obtained in the different scenarios analysed are discussed with a view to supporting the design of more efficient asset management policies.
Downloads
Article Details

This work is licensed under a Creative Commons Attribution 4.0 International License.
References
Alegre, H. (2008). Gestão patrimonial de infraestruturas de abastecimento de água e de drenagem e tratamento de águas residuais. Laboratório Nacional de Engenharia Civil.
Alegre, H., & Covas, D. (2010). Gestão patrimonial de infra-estruturas de abastecimento de água. Uma abordagem centrada na reabilitação. Série Guias Técnicos No 16, 510. https://poseur.portugal2020.pt/media/4039/guia_tecnico_16.pdf
Alegre, H., Vitorino, D., & Coelho, S. (2014). Infrastructure value index: A powerful modelling tool for combined long-term planning of linear and vertical assets. Procedia Engineering, 89, 1428–1436. https://doi.org/10.1016/j.proeng.2014.11.469
Amaral, R., Alegre, H., & Matos, J. S. (2016). A service-oriented approach to assessing the infrastructure value index. Water Science and Technology, 74(2), 542–548. https://doi.org/10.2166/wst.2016.250
Chen, L., & Bai, Q. (2019). Optimization in decision making in infrastructure asset management: A review. Applied Sciences (Switzerland), 9(7). https://doi.org/10.3390/app9071380
Dandy, G. C., & Engelhardt, M. O. (2001). Optimal scheduling of water pipe replacement using genetic algorithms. Journal of Water Resources Planning and Management, 127(4), 214–223.
Dridi, L., Parizeau, M., Mailhot, A., & Villeneuve, J. P. (2008). Using evolutionary optimization techniques for scheduling water pipe renewal considering a short planning horizon. Computer-Aided Civil and Infrastructure Engineering, 23(8), 625–635. https://doi.org/10.1111/j.1467-8667.2008.00564.x
France-Mensah, J., & O’Brien, W. J. (2018). Budget Allocation Models for Pavement Maintenance and Rehabilitation: Comparative Case Study. Journal of Management in Engineering, 34(2), 05018002. https://doi.org/10.1061/(asce)me.1943-5479.0000599
Gao, L., Xie, C., Zhang, Z., & Waller, S. T. (2012). Network-Level Road Pavement Maintenance and Rehabilitation Scheduling for Optimal Performance Improvement and Budget Utilization. Computer-Aided Civil and Infrastructure Engineering, 27(4), 278–287. https://doi.org/10.1111/j.1467-8667.2011.00733.x
Gurgur, C. Z., & Morley, C. T. (2008). Lockheed Martin Space Systems Company optimizes infrastructure project-portfolio selection. Interfaces, 38(4), 251–262. https://doi.org/10.1287/inte.1080.0378
ISO. (2014). ISO 55000:2014. Asset management — Overview, principles and terminology. In International Organization for Standardization (Vol. 1, Issue March, p. 25).
Kabir, G., Sadiq, R., & Tesfamariam, S. (2014). A review of multi-criteria decision-making methods for infrastructure management. In Structure and Infrastructure Engineering (Vol. 10, Issue 9, pp. 1176–1210). Taylor & Francis. https://doi.org/10.1080/15732479.2013.795978
Koppinen, T., & Rosqvist, T. (2010). Dynamic Project Portfolio Selection in infrastructure sector. Engineering Asset Management Review, 1, 311–326. https://doi.org/10.1007/978-1-84996-178-3_16
Mazumder, R. K., Salman, A. M., Li, Y., & Yu, X. (2018). Performance Evaluation of Water Distribution Systems and Asset Management. Journal of Infrastructure Systems, 24(3), 24. https://doi.org/10.1061/(asce)is.1943-555x.0000426
Shin, H., Joo, C., & Koo, J. (2016). Optimal Rehabilitation Model for Water Pipeline Systems with Genetic Algorithm. Procedia Engineering, 154, 384–390. https://doi.org/10.1016/j.proeng.2016.07.497
Tavana, M., Keramatpour, M., Santos-arteaga, F. J., & Ghorbaniane, E. (2015). A fuzzy hybrid project portfolio selection method using Data Envelopment Analysis, TOPSIS and Integer Programming. 42, 8432–8444. https://doi.org/10.1016/j.eswa.2015.06.057
Vieira, J., Almeida, N., Silva, J. G., Castro, C., Lima, B., & Trindade, M. (2020). Using Indicators to Deal with Uncertainty in the Capital Renewals Planning of an Industrial Water Supply System: Testing the Infrastructure Value Index. In Engineering Assets and Public Infrastructures in the Age of Digitalization (Vol. 2, pp. 226–237). Springer International Publishing. https://doi.org/10.1007/978-3-030-48021-9_26
Vieira, J., Cabral, M., Almeida, N., Silva, J. G., & Covas, D. (2020). Novel methodology for efficiency-based long-term investment planning in water infrastructures. Structure and Infrastructure Engineering, 16(12), 1654–1668. https://doi.org/10.1080/15732479.2020.1722715
Yeo, K. T., & Qiu, F. (2003). The value of management flexibility-a real option approach to investment evaluation. International Journal of Project Management, 21(4), 243–250. https://doi.org/10.1016/S0263-7863(02)00025-X